Determining the necessary materials and their specifications, estimating their quantities from the executive plans, estimating the cost, and preparing work equipment and tools
- Planning the path of the water and sewage networks and following up the drilling of the path in the walls
Maintenance, formation, installation and connection of mineral and plastic water networks and domestic sewage networks according to the plans
- Installing sanitary parts, such as: washbasins, bathroom sets, sinks and their accessories from batteries, connecting them to the water source, installing and connecting water heaters, tanks, and pumps
- Checking network pressure, leakage, and maintenance of water networks, sanitary parts, and sewage networks in the university buildings
- Selection of plumbing materials depending on the location and uses of the university buildings
Inspect plumbing systems to identify and replace damaged parts
Test plumbing systems for leaks and other problems
- Installation of cooling and heating systems and water heaters
- Discovering faults and errors in the sewage systems before starting the installation of pipes
Design of preliminary plans for sewage pipes
- Assembling equipment and valves for their installation
Installing toilets on pipes and sewers
- Follow safety and security rules